Ready for launch June 2009

Ready for launch June 2009

Since bringing Sun Dog ashore in September 2008 she has benefitted from the following upgrading work.

New tan mainsail (Owen Sails)
New tan stackpack (Owen Sails)
Cage built over gas heater vent to prevent genoa sheets fouling.
All winches including mast winches renewed to Lewmar self tailers apart from the mainsheet winch, as it’s better being a standard winch.
New stainless steel grab rails manufactured for the sides of the wheelhouse.
New teak block made for under the mast and also for the reefing winch.(what a job finding solid Burmese teak!)
Underside cleaned and anti-fouled with new main anode plus bow thruster anodes replaced.
Renewed the top guardwire on both sides.
New bilge pump.
Rubber buffer cleaned prepared as per Sika techincal dept advice and re-sealed top and bottom with Sika 291 to prevent water ingress and subsequent staining of the hull.
Prop cleaned and polished.
Brightwork varnished.